Fabulous
Interactive preview

More templates like this

Browse all templates →

About this template · Updated September 2026

The Moving Checklist — Wellness & Routines interactive worksheet preview
The Moving Checklist — a filled-in example

A move looks like one big job, but it behaves like a few hundred small ones that share a deadline. Each is easy on its own: call the mover, order boxes, forward the mail. The trouble is timing: the small jobs drift toward the last week, the last week overflows, and moving day arrives with the fridge still full and nobody booked to carry the couch.

This checklist is built around the one date that will not drift: moving day. Everything else is counted back from it.

One date, eight lists

The countdown has eight stops: eight weeks out, six, four, two, one, the day before, moving day and the week after. Enter a date and each stop gets real calendar days, so "four weeks out" becomes a named week rather than a vague idea. Push the move back and every list, deadline and utility date slides with it.

The sheet opens on the list you are in. If you are starting late, anything still open from a list whose dates have passed waits at the top of this week under Carried over. Do it now, or skip it because it does not fit your move; a skipped line stops counting against you. Each list also takes three tasks of your own, in your handwriting, for what no generic list knows about, like the cable box that has to go back.

Why the countdown starts so early

People are reliably too hopeful about their own schedules. In the study that named the planning fallacy, students guessed they would finish their theses in about thirty-four days and took about fifty-five on average. Even their worst-case guesses, about forty-nine days, came in short, and only about three in ten finished by the date they had predicted. A move is made of such tasks, and its date cannot slip, so the checklist puts the slack at the front, where the work is cheap.

Dates help for a second reason. Research on if-then plans, summarized by Peter Gollwitzer, found that deciding when and where you will act, not only what, makes people more likely to get started. A task pinned to the week of October 3 is closer to that kind of plan than "book the truck soon."

Know what that evidence does not say. No study shows that eight weeks is the right lead time; it is the stretch most moving guides use, and a studio across town needs less than a family crossing the country. The research backs the method, a fixed date with dated steps before it; the tasks are ordinary moving practice, so change them to fit your move.

The box log

Write each box’s number and its new room on two sides, since tops vanish once boxes are stacked. On the sheet, tap the plus under a room and the log gives the box its next number; add a few words about what is inside, and mark the box you will want on the first night as open first.

On moving day, switch the log to unloading and tap each box as it comes off the truck; the sheet names any number still missing, by room, while the crew can still look. "Box 14, kitchen" is something you can go and find. "One of the kitchen boxes" is not.

Who needs the new address

For a US move, mail forwarding comes first. USPS says forwarding can begin within three business days of your request but recommends allowing up to two weeks, which is why the list asks for it two weeks ahead. First-Class Mail is forwarded free for twelve months, and the online form verifies you with a small charge to a card billed to your old or new address.

Forwarding has a limit worth knowing: the order only updates your mailing address with the Postal Service. Agencies and companies have to hear it from you, which is the rest of the list: the IRS on Form 8822, your state DMV for your license and car registration (deadlines vary by state), voter registration, any benefits you receive, banks and card issuers, your employer, insurers, doctors and pharmacy, schools, and your subscriptions. Utilities get two checks each: service on at the new place by the day before you arrive, and off at the old place the day after you leave.

Hiring a mover to cross state lines? Look the company up first in the registered mover database from FMCSA, the federal agency that oversees interstate movers. Before an interstate move, movers are required to give you the booklet Your Rights and Responsibilities When You Move and the Ready to Move brochure. FMCSA cannot settle a claim against a moving company for you, one more reason to check before you book.

When to use it

Start the week you know your date and come back weekly; the sheet always opens on the current list, and it prints for the fridge on two pages.

If the eight-week list has you sorting everything you own, the Decluttering Checklist helps you decide what earns a box. When the rooms are empty and the keys are about to go back, the Move-Out Cleaning Checklist takes over. For a first place of your own, the First Apartment Checklist sorts what you have from what you still need.

Frequently asked questions

What should be on a moving checklist?

The jobs that feel optional until they are urgent: quotes and a booked mover or truck, notice to a landlord, packing supplies, school and medical records, utility dates, mail forwarding and a first-night box. This one sorts forty-six of them into eight lists by their distance from moving day, then adds a twelve-line address list and the utilities at both homes.

How far in advance should I start planning a move?

Eight weeks leaves room to compare movers and clear out what is not coming with you. Starting later still works: set the date anyway, and the sheet opens on the right week and moves anything from earlier lists to the top, where you can do it or skip it on purpose.

Who do I need to notify when I move?

Start with USPS mail forwarding, but know its limits: the Postal Service says a change of address order changes your mailing address with it alone. Agencies and companies still need to hear from you, so the list covers the IRS on Form 8822, your state DMV, voter registration, benefits, banks, your employer, insurers, doctors, schools and subscriptions.

When should I set up utilities at my new home?

Book them about four weeks out, once the date is firm. Ask for electricity, gas, water and internet to start at the new place by the day before you arrive and to stop at the old place the day after you leave, so neither home goes dark while you clean or unpack.

Is there a printable moving checklist PDF?

The sheet on this page shows a sample move. Personalize it for free in HabitatZero, set your own date and press print the plan: all eight lists, the address list and the utilities fit on one page, the box log fills a second, and Save as PDF in the print dialog keeps a copy.

Ready to give it a try?

By the team behind Fabulous, the science-based self-care app used by over 30 million people.